With nearly 20 years of electrical experience, Landers Electric specializes in reliable electrical panel upgrades in Clairemont, CA, serving Clairemont, Bay Park, North Clairemont, and surrounding San Diego communities. Our licensed electricians handle everything from 100 to 400 amp service upgrades to Zinsco and Federal Pacific breaker box replacements and SDG&E permit coordination. Homeowners and businesses trust Landers Electric for safe, NEC and CEC code-compliant installations done right the first time.


📞 Call Now For A Quote Over The Phone
📱 Or Text Us Anytime


Electrical panel upgrade in San Diego County — 200 amp main panel replacement by Landers Electric, licensed C-10 electrical contractor.


Looking For an Electrical Panel Upgrade in Clairemont, CA?

Look no further!

Landers Electric specializes in upgrading electrical panels throughout Clairemont and the surrounding San Diego communities.

Whether your electricity is fed from overhead power lines above your home or underground, we can guide you through the entire process from start to finish.

The goal of this page is to help you understand why you might need an electrical panel upgrade in Clairemont, what size panel is right for your home, how much it costs, and exactly what to expect when you hire us to get the job done.

It is important to state upfront that electrical panel upgrades are extremely technical and dangerous work. They should never be performed by an untrained individual. The information on this page is strictly educational.

When hiring an electrical contractor in Clairemont, always verify their contractor license status with the California State License Board (CSLB) and confirm they carry a general liability insurance policy.

Before we get to the specifics of the electrical panel upgrade process, it is necessary to answer a few questions you might have.

With that, let's get started.

If you use links on this page, Landers Electric may earn a small commission at no additional cost to you.


Electrical Panel Upgrade for an EV Charger in Clairemont?

Many electric vehicle (EV) chargers require a dedicated 40 to 60-amp breaker. If your current electrical panel does not have the capacity or available space, you may need a panel upgrade before installing a charger. This is one of the most common reasons Clairemont homeowners call us for panel replacements.

Clairemont is one of the most active neighborhoods in all of San Diego for home upgrades and ADU construction right now. According to recent data, Clairemont issued the highest number of ADU permits in the entire city over the past 12 months, 192 permits, which is not surprising given the neighborhood's generous 6,000 to 8,000 square foot lots and the City of San Diego's expanded ADU allowances. Nearly every ADU project we are involved with in Clairemont triggers a panel evaluation, and the same is true for EV charger installations.

A Level 2 EV charger requires a dedicated 40 to 60 amp circuit. Most of Clairemont's 1950s and 1960s era ranch-style homes were built with 100-amp panels that are now 55 to 75 years old. Those panels were not designed for EV chargers, and most do not have the spare capacity to add one safely without an upgrade.

When it comes to EV chargers, our experience shows that a hardwired unit is more reliable and safer than a plug-in model. Hardwiring reduces outlet wear and ensures the charger operates at its full capacity without interruptions.

For homeowners ready to move forward, here is the EV charger we recommend based on reliability and ease of installation:

Planning to install an EV charger alongside your panel upgrade? In most cases, we can determine what size panel you need and provide a quote with just a phone call. CALL: (760) 690-7517 or Text Us anytime and we will get right back to you. We will check your panel's capacity, handle all the permits, and make sure your upgrade is done safely and to code.


Need help with your electrical panel upgrade? Call us today for a free quote over the phone!


Do You Need an Electrical Panel Upgrade in Clairemont?

Below are a few reasons you might need an electrical panel upgrade or replacement.

Breakers keep tripping

Melted bus bar from a faulty circuit

A burning smell is coming from the electrical panel

The electrical panel is physically deteriorating, with rust, corrosion, or visible damage from age

More amperage is needed for added loads such as an electric vehicle charger, oven, fireplace, heat pump, or mini-split system

An older Zinsco or Federal Pacific (Stab-Lok) panel that is known to be a fire and safety hazard

A home inspection ahead of a sale or refinance that flagged the electrical panel as a concern

Adding an ADU to your Clairemont property. Clairemont issued more ADU permits than any other San Diego neighborhood last year, and almost every ADU project starts with a panel evaluation

These are a few of the many reasons you might be thinking about upgrading your electrical panel. Below are some photos of electrical panels that were in desperate need of an upgrade.

The electrical panel and wiring in these photos were in really bad shape. CLICK HERE for more information on electrical wiring.


Is There an Advantage to Upgrading Your Electrical Panel in Clairemont?

In short, yes.

Many Clairemont homeowners invest in the visible updates, such as a remodeled kitchen, an open floor plan conversion, and a landscaped backyard that takes advantage of the ocean breezes coming off nearby Mission Bay. Those are all great investments in a neighborhood where single-family homes are now selling above the $1.1 million median and demand remains strong.

One thing that gets overlooked far too often, though, is the backbone of the entire electrical system.

The backbone consists of all the wires and materials you cannot see. The electrical panel is the main component of all of it.

It is not pretty. It is not going to impress your guests or make your ranch-style home look modern and up to date. But a properly sized, code-compliant electrical panel is what ensures that all the new light fixtures, smart switches, ceiling fans, EV chargers, and other components you install continue to operate safely and without interruption for many years to come.

Here is what makes Clairemont especially relevant. Clairemont was San Diego's first major master-planned post-war suburb, developed starting in 1950 by builders Carlos Tavares and Louis Burgener. Approximately 6,000 homes were constructed between 1950 and 1954 alone. In North Clairemont, an incredible 87.9 percent of all homes were built between 1940 and 1969. The median construction year across Clairemont Mesa East and West is 1968.

That means the vast majority of Clairemont homes are now between 55 and 75 years old, and many of them are still running on the original 100-amp panels they were built with. Those panels were standard for the era. They handled the electrical demands of a 1950s or 1960s household. But they were never designed for a home office drawing heavy power, a Level 2 EV charger, a heat pump, a full ADU, and the rest of what modern living demands from a residential electrical system.

Clairemont is also the number one ADU neighborhood in all of San Diego. If you are planning to add a garage conversion, a detached unit, or any accessory structure to your property, your panel capacity will almost certainly need to be evaluated as part of that project. Starting with a proper 200-amp service means your ADU project has the electrical foundation it needs from day one.

An upgrade gives you the capacity, safety, and long-term reliability your Clairemont home deserves.

Renovating your entire home or adding an ADU? CLICK HERE for more information on our electrical wiring services.


Need help with your electrical panel upgrade? Call us today for a free quote over the phone!


What Size Electrical Panel Do You Need in Clairemont?

Electrical panels are sized in amps. The panel you choose will depend on your electrical needs today and your plans for the future.

Below is a breakdown of the most common electrical panel options and why you might choose one over another. This is not a comprehensive list, but it will help give you a clear idea of which panel is right for your Clairemont home.

125 Amp Electrical Panel Upgrade or Replacement

You are not adding any electrical load and simply need to replace your existing 100 or 125-amp panel. Your panel is damaged, failing, or physically deteriorating and needs replacement. You have an underground service and do not have the budget for a full 200-amp upgrade at this time.

200 Amp Electrical Panel Upgrade or Replacement — The Most Common Upgrade in Clairemont

You are not adding any electrical load today, but have plans to in the future. You are looking to add one or two electrical appliances and one electric vehicle charger. You are installing a larger capacity photovoltaic (solar) system. You are planning or permitting an ADU on your Clairemont property. This is the current industry standard for residential properties and the right choice for the vast majority of Clairemont single-family homes.s

400 Amp Electrical Panel Upgrade or Replacement

You need a 400-amp replacement for an existing oversized service. You are installing two electric vehicle chargers alongside many other high-demand electric appliances. You are looking to fully electrify your home, replacing all gas appliances with electric alternatives. You are adding a full ADU and need significant additional capacity for both the main house and the new unit. You are pairing a large solar array with a whole-home battery storage system.

Not sure what size panel is right for your Clairemont home? Most homeowners do not want to run load calculations, and you should not have to. CALL: (760) 690-7517 or Text Us anytime, and we will size it correctly for you over the phone. No pressure, no guesswork.


How Much Does an Electrical Panel Upgrade Cost in Clairemont, CA?

The cost of upgrading your electrical panel can vary widely depending on your service type and the specific requirements of your installation.

Below are the two most typical cost ranges for properties in Clairemont and the greater San Diego area.

Overhead Service (power lines run above your property with a service drop connecting to the weatherhead above your roof) $3,500 to $5,500

Underground Service (no overhead power lines, panel is fed underground from a ground-mounted transformer) $7,000 to $20,000

Underground service upgrades cost significantly more because they require SDG&E coordination, a formal trench inspector pre-meet, conduit excavation, and multiple inspections before the work is complete. While many of Clairemont's older ranch-style homes have overhead service, some properties and newer infill developments in the area have underground utility feeds.

Additional cost factors include panel amperage (200A vs. 400A), whether stucco or exterior siding repairs are needed after the installation, and permit fees paid to the City of San Diego Development Services Department.

We provide honest, itemized pricing upfront. no hidden fees and no surprises at the end of the job.


Service Area Map – Landers Electric

We proudly serve Clairemont, CA, with expert residential and commercial electrical panel upgrade services. Whether you need a licensed electrician in Clairemont to safely replace outdated or hazardous Zinsco or Federal Pacific panels, upgrade your home to a 200-amp electrical service, or manage San Diego Gas & Electric (SDG&E) permit coordination, our experienced team delivers safe, reliable, and fully code-compliant electrical solutions in Clairemont, CA.

A Warning About Unlicensed Electrical Contractors in Clairemont

Before we get into the process, this needs to be said.

Many so-called electricians will quote you a much lower price and tell you it is not necessary to wait for SDG&E to process your service change request or to pull a permit through the City of San Diego.

If you run into one of these unprofessional scam artists, send them down the road.

In California, performing an electrical panel upgrade without a permit is illegal. It voids your homeowner's insurance, creates personal liability for you if anything goes wrong, and causes serious complications when you go to sell your home. For Clairemont homeowners who are also planning an ADU, and there are more of you here than anywhere else in the city, unpermitted electrical work on the main panel creates direct complications for the ADU permit process as well.

The City of San Diego requires an electrical permit for all electrical work, including panel upgrades, under San Diego Municipal Code Section 129. A permit can only be issued to a licensed California State Contractor authorized to perform electrical installations.

Any legitimate, licensed electrical contractor knows exactly how to handle this process. If someone is telling you a permit is not worth it or is not required, they are cutting corners, and you will be the one left dealing with the consequences.

Always verify your contractor's license before signing anything: CSLB License Lookup.

The Clairemont Electrical Panel Upgrade Process -- Step by Step

Now that we have covered the key questions, it is time to walk through exactly what to expect from the day you call us to the day your new panel passes final inspection.

One important thing to understand about Clairemont: Clairemont is a community within the City of San Diego -- it is not a separate incorporated city. This means all electrical permits are issued by the City of San Diego Development Services Department (DSD), not a standalone Clairemont building department. Permits are submitted online through the City of San Diego DSD portal. All new permit applications must be submitted online.

SDG&E is the utility provider for Clairemont. All service change requests, trench inspections, and disconnect/reconnect coordination go through SDG&E. We handle all permit applications and SDG&E coordination on your behalf from start to finish.

Below is an outline of the full electrical panel upgrade process. You can click any link to jump to that section.

  1. Request a Service Change From San Diego Gas and Electric (SDG&E)

  2. Waiting Period SDG&E Assigns a Planner

  3. Apply For an Electrical Permit Through the City of San Diego Development Services Department

  4. Schedule a Pre-Meet With the SDG&E Trench Inspector (Underground Service Only)

  5. Dig the Trench and Install Conduit (Underground Service Only)

  6. Trench Inspection and Backfill (Underground Service Only)

  7. Schedule the Disconnect/Reconnect With SDG&E

  8. SDG&E Power Disconnection

  9. Install the Grounding and Bonding System

  10. Electrical Panel Removal and Installation

  11. Repair Stucco or Siding

  12. Pass the City of San Diego Final Inspection

Are you ready?

Here we go!

Step 1: Request a Service Change From San Diego Gas and Electric (SDG&E)

To get your Clairemont panel upgrade started, you must first submit a service change request to San Diego Gas and Electric (SDG&E), the utility provider for Clairemont and all of San Diego County.

This request notifies SDG&E that a service change is planned at your property and kicks off their internal review and planning process. Without this step, SDG&E will not be prepared to disconnect and reconnect your service on installation day.

Here are the steps:

Go to SDG&E's work order request form website. Fill out all the necessary information for your installation. Review all the forms and click submit.

This paperwork is included in the cost of your panel upgrade when you hire Landers Electric. We submit it on your behalf and follow up directly with SDG&E so you do not have to manage any of it.

Step 2: Waiting Period — SDG&E Assigns a Planner

Once the work order has been submitted, the waiting period begins. How long you wait depends on SDG&E's current workload and the complexity of your service configuration.

After the waiting period, your project is assigned to an SDG&E planner. This planner will come out to your Clairemont property, assess the installation area, and design the job.

Once complete, the planner will email a detailed report called a work order, with all the requirements for your panel upgrade. This includes:

Panel location,n Conduit size, Required clearances, Meter height, Trenching route and depth (for underground service only)

Once the work order is received from SDG&E, it is time to apply for the permit.

Step 3: Apply For an Electrical Permit Through the City of San Diego Development Services Department

After receiving the SDG&E work order, the next step is to pull an electrical permit through the City of San Diego.

A PERMIT IS ALWAYS REQUIRED when upgrading an electrical panel in Clairemont.

Many so-called electricians will quote you a lower price and tell you it is not necessary to wait for SDG&E to process your request or to pull a city permit.

If you run into one of those contractors, send them down the road.

All electrical permits in Clairemont are issued by the City of San Diego Development Services Department (DSD). Permit applications are submitted online through the City of San Diego DSD portal. The City of San Diego DSD public counters are open Monday through Thursday from 7 a.m. to 4 p.m. and Friday from 10 a.m. to 4 p.m. for in-person appointments, but for most electrical panel upgrade permits, online submission is the standard process.

We handle the entire permit application on your behalf from start to finish. You do not ?/need to navigate any of this yourself.

Not sure how permits work in Clairemont? CALL: (760) 690-7517 or Text Us anytime. We pull all required permits and handle every piece of paperwork for you.

Step 4: Schedule a Pre-Meet With the SDG&E Trench Inspector (Underground Service Only)

Steps 4, 5, and 6 apply only to underground electrical services.

Before we go any further, it is important to understand the difference between overhead and underground electrical services.

An overhead electrical service is easy to identify. Walk outside and look up. If you see power lines above your property with one set of wires running to the conduit above your electrical panel, you have an overhead service. Overhead service is very common throughout Clairemont, given the age of the neighborhood's housing stock — most of the 1950s and 1960s era homes were built with overhead utility connections.

An underground electrical service has no overhead power lines. If you look around your property and see green ground-mounted SDG&E transformers on or near the lot, that is a strong sign you have an underground service.

Now back to Step 4.

After receiving the SDG&E work order and pulling the city permit, the next step for an underground service is to schedule a pre-meet with an SDG&E trench inspector. Their job is to ensure the new underground conduit is installed according to SDG&E's standards.

This meeting helps both the homeowner and the electrical contractor understand exactly what is required for the underground portion of the installation, so that it is completed the first time correctly.

It is important to call Dig Alert (811) before scheduling this meeting. The work area must be marked with white paint before Dig Alert's arrival. You will not be able to schedule the trench inspector meeting without a Dig Alert reference number. We coordinate all of this for you.

Step 5: Dig the Trench and Install Conduit (Underground Service Only)

Once the SDG&E trench inspector has provided all the necessary directions for the new underground conduit, construction can begin.

The trench is excavated, and approximately 90 percent of the conduit is installed. The final 10 percent of the section that enters into SDG&E's handhole or transformer vault cannot be installed by the electrical contractor. That portion is completed by a utility contractor after the trench is inspected a second time by the trench inspector.

Step 6: Trench Inspection and Backfill (Underground Service Only)

As stated in Step 5, once the conduit has been 90 percent installed, the SDG&E trench inspector must be contacted a second time to approve the installation of the last 10 percent of conduit entering the utility handhole or transformer.

Once that inspection is passed, the SDG&E service coordinator is called to schedule a crew to come out and complete the final conduit installation.

After SDG&E finishes its portion, the electrical contractor is cleared to backfill the trench and repair any driveway, sidewalk, or landscaping that was removed during excavation.

Once all repairs are complete, the trench inspector must be called one last time to approve a final inspection on the underground work. Once that inspection is approved, the panel upgrade can continue to Step 7.

Step 7: Schedule the Disconnect/Reconnect With SDG&E

Steps 4 through 6 were strictly for underground electrical services. Steps 7 through 12 apply to both overhead and underground services.

This step is scheduling what is called a disconnect/reconnect. The disconnect/reconnect is the date SDG&E will de-energize your service so the old panel can be safely removed and the new one installed. This is the main installation day.

The disconnect/reconnect is scheduled through your assigned SDG&E service coordinator. Once the date is confirmed, the City of San Diego Development Services Department is notified so a city inspector can be scheduled to come out to your property on the same day.

Step 8: SDG&E Power Disconnection

Step 8 brings us to the day of the actual electrical panel upgrade.

Early in the morning, an SDG&E crew arrives at your Clairemont property to disconnect power at the utility source. This is the only safe way to remove an existing panel, and it is the only way we work.

It is important to remember that approximately three days before the scheduled disconnection date, Dig Alert (811) should be called to re-mark all existing underground utilities in the work area, including gas, water, AT&T, Cox Cable, and others.

Step 9: Install the Grounding and Bonding System

The National Electrical Code requires proper grounding and bonding for all new electrical panel installations.

This includes two ground rods, a cold water pipe bond, and an electrical panel connection.

Some electrical contractors prefer to install the ground rods before the utility power disconnection day because a large pneumatic jackhammer is needed to drive both rods 8 feet into the ground. Planning this step keeps the installation day running efficiently.

Once the ground rods are in place, an unbroken solid copper ground wire sized according to the National Electrical Code must connect both ground rods, the cold water pipe, and the electrical panel.

Proper grounding is required by code and is what protects your home and family in the event of an electrical fault. If you would rather leave this step to a licensed professional, CALL: (760) 690-7517 or Text Us anytime and we will get right back to you.

Step 10: Electrical Panel Removal and Installation

THIS STEP CAN ONLY BE COMPLETED ONCE SDG&E HAS DISCONNECTED THE POWER AT THE UTILITY SOURCE.

Once the power has been disconnected at its origination point, the old panel is carefully removed, and the new panel is installed.

If you have an overhead electrical service, a new riser and weatherhead will be installed at least 24 inches above the roofline for utility connection.

After the installation, a City of San Diego Development Services Department inspector visits the site to verify that the installation is in compliance with the National Electrical Code. If the inspection is passed, the city inspector notifies SDG&E, and power is restored to your home the same day.

Step 11: Repair Stucco or Siding

Removing an electrical panel requires cutting into the exterior stucco or siding of the home.

Once the panel is installed and the inspection is on the calendar, the affected area is patched, waterproofed, and textured to match the surrounding exterior as closely as possible. Most Clairemont homes have stucco exteriors that are characteristic of the 1950s and 1960s ranch-style construction, and this type of repair is routine work for us in this neighborhood.

Repairs must be completed, and the affected area must be painted before a final inspection can be passed.

We handle this repair as part of the job, so your home is left clean and weather-tight.

Step 12: Pass the City of San Diego Final Inspection

The final inspection is the last milestone in the electrical panel upgrade process.

A City of San Diego Development Services Department inspector reviews the entire completed installation, the panel, grounding system, conductor labeling, stucco repair, and waterproofing to verify compliance with the NEC, CEC, and all applicable City of San Diego requirements.

Remember that stucco or siding repairs and waterproofing must be completed, and the affected area must be painted before the final inspection can be passed.

Once the final inspection is approved, the electrical panel upgrade is complete, and your power is permanently restored under your new electrical service.

When you hire Landers Electric, we stay on the job until the city inspection is passed and your power is safely restored. CALL: (760) 690-7517 or Text Us anytime and we will get right back to you.

Frequently Asked Questions About Electrical Panel Upgrades in Clairemont, CA

What are the signs that I need an electrical panel upgrade?

Common signs include flickering lights, frequently tripping breakers, a burning smell coming from the panel, or a panel that is physically deteriorating from age. If you are planning to add an EV charger, a new HVAC system, an ADU, or any other high-demand load, those are also strong reasons to evaluate your current panel capacity. If your Clairemont home still has its original 100-amp panel from the 1950s or 1960s, it is well worth having it assessed.

What is the average cost of an electrical panel upgrade in Clairemont?

In the San Diego area, a standard overhead service panel upgrade typically costs between $3,500 and $5,500. An underground service upgrade is more extensive and typically ranges from $7,000 to $20,000, depending on the scope, panel amperage, and site conditions. Contact us for a specific quote for your Clairemont property.

Who issues electrical permits in Clairemont?

Clairemont is a community within the City of San Diego. All electrical permits are issued by the City of San Diego Development Services Department (DSD). Permits are submitted online through the City of San Diego DSD portal. Landers Electric handles all permit applications on your behalf from start to finish.

How long does an electrical panel upgrade take in Clairemont?

The physical installation is typically completed in a single day. The full process — including the SDG&E work order, waiting period, city permit, and all required inspections — can take several weeks from start to finish, depending on SDG&E's current processing times and whether your service is overhead or underground.

Is a 100-amp panel enough for my Clairemont home?

For most modern homes in Clairemont, a 100-amp panel is no longer sufficient. A 200-amp panel is now the industry standard and handles modern appliances, air conditioning, and EV chargers without issue. Given that the vast majority of Clairemont homes were built in the 1950s and 1960s and many still have original or early-replacement 100-amp services, upgrading is one of the most impactful long-term improvements a Clairemont homeowner can make.

I am planning to build an ADU on my Clairemont property. Do I need a panel upgrade first?

Not always, but in many cases, yes. Adding an ADU increases the total electrical load on your property. If your existing 100-amp panel does not have sufficient capacity to serve both your main home and the new unit at full load, an upgrade will be required before or during the ADU permitting process. We can assess your current panel capacity and advise you on the right approach before you start the ADU permit application.

Can I do a panel upgrade myself?

No. An electrical panel upgrade is extremely technical and dangerous work involving high-voltage power. Under San Diego Municipal Code Section 129, electrical permits can only be issued to a licensed California State Contractor. Attempting this work without a license means no permit, no inspection, and no legal or insurance protection for you as the homeowner.

Who do I contact for an electrical panel upgrade in Clairemont?

Contact Landers Electric at (760) 690-7517 or visit landerselectric.net. We will assess your situation, give you an honest quote, and handle the entire process from the first SDG&E work order to the final city inspection.

For Electricians and Contractors in San Diego County

At Landers Electric, we do not just upgrade panels for homeowners. We also mentor and train the next generation of contractors. With over 20 years of hands-on electrical and construction experience throughout San Diego County, I have learned exactly what it takes to build and scale a profitable business in this trade.

That is why I created my live webinar: How to Start a Profitable Construction Company. In this training, I share proven systems for everything from licensing, estimating, and contracts to hiring, marketing, and scaling your crew. It is designed for electricians, plumbers, HVAC techs, general contractors, and anyone ready to take the next step from working in the field to running their own operation.

If you are serious about starting your own company or taking your current contracting business to the next level, this webinar gives you step-by-step guidance from someone who has built a successful electrical company right here in San Diego.

Learn More About the Webinar

As always, if you need a licensed professional to handle your electrical panel upgrade in Clairemont, please do not hesitate to reach out.

At Landers Electric, we take pride in completing every panel upgrade safely, code-compliantly, and on time, giving you peace of mind that the job is done right.

Stephan Landers | Owner and Master Electrician | Landers Electric

Landers Electric also provides 200-amp electrical panel upgrades for homeowners in Temecula, Murrieta, and surrounding Southwest Riverside County communities. Many homes in these areas require electrical service upgrades to support EV chargers, air conditioning systems, and modern electrical loads.

Learn more about our Temecula electrical panel upgrade services

Looking to future-proof your Clairemont home or business? We also offer professional EV charger installation in San Diego with licensed electricians handling everything from permits to safe 240-volt wiring.

Learn more about EV charger installation.


About the Author
Stephan Landers is a California C-10 Electrical Contractors License holder (CSLB License #1089091) and the founder of Landers Electrical Contracting Inc. With over 20 years of experience, he is dedicated to providing expert advice and quality electrical services in San Diego.

You can view his professional licenses and certifications here:About Stephan Landers

Proud Member of the North San Diego County Chamber of Commerce


About Stephan Landers


Request a Free Electrical Panel Upgrade Estimate in Clairemont

If your Clairemont home or property needs an electrical panel upgrade, Landers Electric is ready to help. We provide free written estimates, manage every aspect of the permitting and SDG&E coordination process, and guarantee our work meets all applicable codes and inspection requirements.